Countertop Fabrication Agreement

If you have purchased natural stone work tables, we ask you to personally approve the plates to be used in the manufacture of your project. Once the hardware is approved and we have all the manufacturing information we need, including the sinks and faucets underassembled in the shop, we will create a shop folder that will be given to our production team. Volume surface designs use the design, measurement and design details you provide to make an estimate for you. After your first payment, we create an employment file that will provide a copy of your quote, installation contract, work plan drawing with dimensions, details of your purchase as well as a waiver of the deposit, which we ask you to sign after your project has been installed to your satisfaction. As soon as the production team receives the shop folder, call them to set your installation date. If your project moves through the production process, each part is checked to make sure it matches the digital model and your manufacturing instructions. Once completed, your work plates will be staged for installation. How long does it take for Solid Surface Designs to build and install a new worktop? The answer relates to the entire process, which ranges from estimate to installation. After installation, we`d like you to thoroughly check your new work discs. We want you to be absolutely satisfied with our work. WAX EDGES AND SEAL COUNTERTOPS AUTOMATICALLY AT THE PLANT AFTER MANUFACTURING. ALL OUR FACILITIES ARE FULL OF MAINTENANCE FOR THE MATERIALS AND THE LABORATORY.

AFTER INSTALLATION, ANY TYPE OF STONE PROTECTION IS EXCLUDED. GERELI IS NOT FOR EVERY DAMAGE OTHER PARTS THEREFORE IT IS CRITICAL, INSTALLATION FOR INSTALLATION FOR INSTALLERS ARE SILENT ON SITE AND SIGN THE CUSTOMER SATISFACTION FORM. Once your model is complete, we verify that the estimated price you paid covers all costs associated with your project. There are a number of factors that can influence costs. The model may reveal an increase in square area; You can update a edge detail, change the way your sink is mounted, or even decide to add new parts to your project (. B for example, a vanity, a beam top, etc.). If there are price increases, you will be contacted immediately and we will discuss your options. AS A MATTER OF POLITICS, WE DO NOT CONNECT DISHWASHERS DIRECTLY TO THE STONE COUNTER TOP. IT`S TO PROTECT YOU. VIBRATIONS, HEAT AND STEAM INEVITABLY CAUSE A COMPLETE RUPTURE OF THE ANCHORAGE AND/OR THE FORMATION OF A CRACKING OF THE STONE WORK PLATE. DISCUSS ARRANGEMENTS WITH OTHER SUB-CONTRACTORS TO CONNECT TO WOOD FURRING STRIPS, THE FLOOR, OR THE WALL PRIOR TO THE GRANITE INSTALLATION.

FOR CORRECT SIZING, PLEASE PROVIDE ALL SINKS, FAUCETS, INSTANT HOT WATER DISPENSERS, SOAP DISPENSERS, FILTERED WATER UNITS AND ANY OTHER FIXTURES PHYSICALLY ON-SITE AT THE TIME OF MEASUREMENT. DEPENDING ON THE LAYOUT, STONE TYPE AND LIGHTING THE LOCATION OF THE SEAM WILL BE DETERMINED BY GERELI. IF YOU HAVE A DROP-IN: DROP IN SINK CUTOUTS ARE EXECUTED AT THE INSTALLATION. PLEASE KEEP YOUR SINK HANDY. REMOVAL OF OLD COUNTERTOPS OR APPLIANCES IS NOT AUTOMATICALLY IN YOUR MANUFACTURING QUOTA. ON THEIR DISCRETION, WE CAN USE REMOVAL WITH AN INDEPENDENT CONTRACTOR FOR A NOMINAL FEE AGREEMENT. IF YOU DO YOUR SINK-MOUNTING: WE NEED YOUR SINK AND/OR TEMPLATE BY MEASURING TIME SO THAT WE CAN PROPERLY SIZE YOUR CUTOUTS MANUFACTURING DURING. BEFORE YOU BUY THE ABAC, ASK FOR PERMISSION TO MEASURE.

FOR CLEANING AND MANUFACTURING PURPOSES UNDER-MOUNTED SINK-OUT WILL NORMALLY OVERHANG APPROXIMATELY 1/4″ FROM THE UNDER MOUNTED SINK EDGE. IF YOU HAVE A SINK CAST IRON OR LARGE FARM, PLEASE USE ALL NECESSARY FACILITIES AND SUPPORT ARRANGEMENTS UNDER BEFORE INSTALLATION AS BY THE SHEET GERELI INSTRUCTION FOR UNDER-COUNTER KITCHEN SINKS.